Photo Collection Index Page
For this database to function correctly, please (a) use a browser that supports JavaScript, and (b) be sure that JavaScript is enabled.
CPRD Gallery
Metal Bank site, Philadelphia, Pennsylvania. Core 10. Photo 2-35 10/9/91
Metal Bank site, Philadelphia, Pennsylvania. Panorama of site from top of steps to mudflat, shot 5. Photo 1-10 10/9/91
Metal Bank site, Philadelphia, Pennsylvania. Core 9. Photo 2-27 10/9/91
Metal Bank site, Philadelphia, Pennsylvania. Core 3. Photo 2-9 10/9/91
Metal Bank site, Philadelphia, Pennsylvania. Core 9. Photo 2-25 10/9/91
Metal Bank site, Philadelphia, Pennsylvania. Test pit 1, bottom sample approximately 12 ft. Photo 2-10 8/24/95
Metal Bank site, Philadelphia, Pennsylvania. Test pit 1, "ash" layer with small chunks of concrete approximately 2 ft. Photo 1-20 8/24/95
Metal Bank, Philadelphia, PA. Pipe draining site? Photo 34 5/7/93.
Metal Bank site, Philadelphia, Pennsylvania. Just right of center flattened grass is location for test pit 1, farther to right is location of previous round test pit. Photo 1-17 8/24/95
Metal Bank site, Philadelphia, Pennsylvania. "Bird Feeder" grass seed on previous round test pit. Photo 1-18 8/24/95
Metal Bank site, Philadelphia, Pennsylvania. Test pit 4, shovel full from approximately 6-7 ft. Photo 1-9 8/24/95
Metal Bank site, Philadelphia, Pennsylvania. Core 10. Photo 2-37 10/9/91
Metal Bank site, Philadelphia, Pennsylvania. Ladder to mudflat is at base of tall tree. Photo 1-15 8/24/95
Metal Bank site, Philadelphia, Pennsylvania. Test pit 8, Gray "ash" layer and start of charcoal colored layer at about 1.5 ft (?). Photo 2-13 8/24/95
Metal Bank site, Philadelphia, Pennsylvania. Test pit 4 is behind backhoe, last round test pit is in front of backhoe. Photo 1-14 8/24/95
Metal Bank site, Philadelphia, Pennsylvania. Test pit 1, debris 8'2". Photo 2-2 8/24/95
Metal Bank site, Philadelphia, Pennsylvania. Test pit 4, about 2-3 ft. Photo 1-5 8/24/95
Metal Bank site, Philadelphia, Pennsylvania. Test pit 8, set-up before digging starts. Photo 2-12 8/24/95
Metal Bank site, Philadelphia, Pennsylvania. Midnight Dump! 10 55gal. drums with tarry residue dumped on the site overnight. Photo 30, 5/7/93
Metal Bank site, Philadelphia, Pennsylvania. Test pit 8, looking approximately north, TP-8 site is located at backhoe. Photo 2-11 8/24/95
PREVIOUS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
NEXT
Revised: May 12, 2000
Office of Response and Restoration, National Ocean Service, National Oceanic and Atmospheric Administration
library@hazmat.noaa.gov